Delivery & Installation
One day. By your showroom. Ready to cook.
A BAXALT outdoor kitchen doesn't arrive as a pallet of parts and a weekend of work. It arrives complete, is set in place by crane in a single day, and is ready to use the moment it's connected. No masonry. No site crew for weeks. No second-guessing.
This is what turnkey means at BAXALT.
How it works
1. Site assessment
Before delivery, your BAXALT showroom partner confirms access, the installation surface, and the connection points. A short checklist (below) tells you everything to prepare. Most gardens and terraces already meet the requirements.
2. Crane delivery
Your kitchen is built and quality-checked at the factory, then transported as a single unit. On installation day, it is lifted into position by crane — over fences, hedges, or rooflines where needed — and lowered precisely onto its location.
3. Set & connect
Once placed, the kitchen is levelled and the appliances are connected. Gas, electricity, and water (where specified) are linked to your existing supply points.
4. Ready to cook
Before the team leaves, everything is tested. You're walked through your kitchen, handed your welcome box, and you cook that same evening if you like.
Typical installation time: one day.
Plug & play, the way it should be
Because every BAXALT kitchen is engineered and assembled in a controlled environment, what reaches your home is a finished product — not a construction project.
- No on-site building. No bricklaying, no curing time, no dust.
- Pre-fitted appliances. Grill, burners, storage, and worktop arrive installed and aligned.
- Single-unit delivery. One kitchen, one piece, one day.
- Immediate use. Cook the same day it's installed.
Built to stay outside, all year
A BAXALT kitchen is a permanent installation, not a fair-weather accessory you cover up in October. Its construction is made to live outdoors through every season — sun, rain, frost, and salt air — without tarpaulins, without dismantling, without seasonal storage.
You install it once. You use it for years.
Installation requirements
Most outdoor spaces are ready as-is. To prepare for your installation day, please ensure the following.
Access for the crane
- A clear path for the delivery vehicle to park within crane reach of the installation point.
- An unobstructed overhead lift path (mind low cables, balconies, or dense tree cover — your partner will advise if anything needs attention).
- Confirmation of any access permissions if the vehicle must stop on a public road (your showroom partner can guide you).
The installation surface
- A firm, level surface able to bear the kitchen's weight — typically a paved terrace, concrete slab, or equivalent stable base.
- Final levelling is handled on the day; the base simply needs to be solid and even.
Connections
- Electricity: a standard outdoor-rated power supply within reach of the kitchen.
- Water: a supply point (cold/hot if available) and drainage within reach.
Your showroom partner confirms the exact positions during the site assessment, so everything lines up on the day.
Questions about your site?
Your nearest BAXALT showroom partner handles the full process — from assessment to the first meal. Find your showroom →